There are many projects that need to be sponsored, we’re trying to get most of them done before school resumes in August 2026. Stand by for more information about how to make donations or other ways to help with these.
Work Week 2026 is TBD
All photos are here https://photos.app.goo.gl/WyvmnyKSqkxCM6oz7
Project pictures







- Wing Shower scrape steel, paint
- Wing Shower move and rewire fan
- Ladies Head, direct replace
- Ladies Head, expanded, new library shelves
- Wing Windows (29 3’+4′ sections)
- Wing window treatments
- Wing lighting (LED tape or 2*2 LED lights)
- Wing Ceiling Weight Room 2*2 LED lights
- Chapter Room Resurface Wood Floor
- Chapter Room Door (strike plate)
- Chapter Room electrical (needs SOW drafted)
- Side Porch Ceiling (replace screws, repaint)
- Front Porch Celing
- Front Door glass sidelights
- Front Door replacement
- Roof Gutters, snow guards
- Roof maintenance plan
- Kitchen fryolator commercial cleaning
- Basement sewer camera
- Basement sewer fix
- Basement foundation exploration
- Basement foundation waterproofing
- Basement French drain
- Basement tankless water heater (3 zone?)
- Hub electrical + drywall
- 2nd Fl Main ceiling
- 2nd Fl Main drywall point, paint
- 3rd floor Drywall demo, replace, paint
- 3rd floor point/paint door molding
- 3rd floor, 6 hallway doors, prehung (w molding?)
- 3rd floor 5 bedroom floors (carpet)
- 3rd floor bathroom ceiling fix
- Fire escape paint stairs, door
- Stair repair, repaint (basement)
- Stair repair, repaint (kitchen to 2nd, main stairs are OK)
- Stair repair, repaint (2nd to 3rd)