Project List

There are many projects that need to be sponsored, we’re trying to get most of them done before school resumes in August 2026. Stand by for more information about how to make donations or other ways to help with these.

Work Week 2026 is TBD

All photos are here https://photos.app.goo.gl/WyvmnyKSqkxCM6oz7

Project pictures

Details here

Exterior
Basement
2nd Floor Main
3rd Floor Main
2nd Floor Wing
Weight Room
  1. Wing Shower scrape steel, paint
  2. Wing Shower move and rewire fan
  3. Ladies Head, direct replace
  4. Ladies Head, expanded, new library shelves
  5. Wing Windows (29 3’+4′ sections)
  6. Wing window treatments
  7. Wing lighting (LED tape or 2*2 LED lights)
  8. Wing Ceiling Weight Room 2*2 LED lights
  9. Chapter Room Resurface Wood Floor
  10. Chapter Room Door (strike plate)
  11. Chapter Room electrical (needs SOW drafted)
  12. Side Porch Ceiling (replace screws, repaint)
  13. Front Porch Celing
  14. Front Door glass sidelights
  15. Front Door replacement
  16. Roof Gutters, snow guards
  17. Roof maintenance plan
  18. Kitchen fryolator commercial cleaning
  19. Basement sewer camera
  20. Basement sewer fix
  21. Basement foundation exploration
  22. Basement foundation waterproofing
  23. Basement French drain
  24. Basement tankless water heater (3 zone?)
  25. Hub electrical + drywall
  26. 2nd Fl Main ceiling
  27. 2nd Fl Main drywall point, paint
  28. 3rd floor Drywall demo, replace, paint
  29. 3rd floor point/paint door molding
  30. 3rd floor, 6 hallway doors, prehung (w molding?)
  31. 3rd floor 5 bedroom floors (carpet)
  32. 3rd floor bathroom ceiling fix
  33. Fire escape paint stairs, door
  34. Stair repair, repaint (basement)
  35. Stair repair, repaint (kitchen to 2nd, main stairs are OK)
  36. Stair repair, repaint (2nd to 3rd)